BLCP Power Station Dredging & Maintenance
Map Ta Phut Industrial Port, Thailand
BLCP required the maintenance dredging of the approach channel to their power station on this industrial estate. The area involved measured approximately 2km in length by approximately 240m in width, and reached depths of 17m.         
 
SMC provided the study, methodology design, risk assessment, tender documentation and procedures as well as site supervision for this project.
project details

client: BLCP Power Limited
services: Dredging Layouts, Dredging, Tendering and Contract Services, Site Supervision
period: 2010-11